TECHNION CAMPUS
STRATEGIC GOAL: BUILDING THE CAMPUS OF THE FUTURE 2009 – 2019
 

Technion map


NEW CONSTRUCTION / RENOVATION
1 Stanley Shalom Zielony Student Union Building – new wing and overall renovation (2009) Completion of 4th floor (2016)
2 D. Dan and Betty Kahn Mechanical Engineering Building (2010)
3 Stanley Shalom Zielony Graduate Student Village (2010) and Community Center (2015)
4 Senate Building – Senate Hall renovation (2012)
5 Undergraduate Student Village (2016)
6 Grand Technion Energy Program floor (2016)
7 Hadarion (2016)
8 Electron Beam Lithography (EBL) Lab (2016)
9 Southern Palm Beach Chapter Expansion of the Fried Student Counselling Center (2017)
10 Rosen Solid State Institute: renovation (2017)
11 David and Janet Polak Visitors Center (2018)
12 Taub Family Terrace (2018)
13 Ullmann Teaching Center – additional floor, structural reinforcement, sheltered areas and elevators (2018)
14 Churchill Plaza renovation (2019)
15 Susan and David Wilstein Gate and Clara Franziska Mertens Gate (2019)

BUILDINGS UNDER CONSTRUCTION
16 “Broshim” Dormitories: two new 14-story towers
17 Amos Horev Sports Arena

RENOVATION PROJECTS UNDERWAY
Technion Strategic Master Plan for Physical Development General Campus
Upgrading all dormitories
Major renovations in Canada Village and Rifkin Dormitories
Upgrading infrastructure throughout campus, including A/C and water-saving systems
Campus safety upgrades, including fire prevention zone
Making campus facilities accessible for disabled individuals: improving accessibility both inside buildings and in outdoor areas

Faculties
Schulich Faculty of Chemistry: labs, teaching facilities, library, infrastructure
Rappaport Faculty of Medicine Wolfson Faculty of Chemical Engineering
Renovating and adding labs in all faculties

Time Lapse Photography D. Dan and Betty Kahn Mechanical Engineering Building


Mech_EngEBL Taub_Terrace Polak_Visitors_Center